Skip to main content

Huntington Beach City School District

Igniting Young Minds to Reach for a Bright Future

Board Meeting Bulletin | November 17, 2026

Posted Date: 11/16/26 (03:30 PM)

Collage of District photos

Board Meeting Bulletin

November 17, 2026

Meeting Information

November 17, 2026 | 6 PM

Livestream Access

Agenda items

Below are some agenda items that may be of specific interest

School Report

Sowers Middle School will present updates on its school activities.

Initial Bargaining Proposals Between the HBCSD and CSEA

To comply with Section 8 of the Educational Employment Relations Act, the District and CSEA and its Chapter 316 must present their initial proposals for the 2026-2027 school year at public hearings. The Board is requested to hold official public hearings on the District’s and CSEA’s initial proposals.

Preschool Instructional Materials and Curriculum Adoption

HBCSD preschool teachers spent six weeks piloting two play-based curricula, Frog Street and The Creative Curriculum. Frog Street was selected because it is user-friendly, gives practical instructional guidance, and fits with the program’s existing assessment tools, including the Desired Results Developmental Profile (DRDP). Adopting one curriculum will also give all five preschool classrooms a shared instructional framework. Staff recommends that the Board adopt Frog Street Curriculum for preschool-aged students, at a cost not to exceed $38,000, funded through the California State Preschool Program (CSPP) account.

Memorandum of Understanding with WestEd to Conduct the California Healthy Kids (CHKS) Survey

The CHKS is sponsored by the California Department of Education. It is an anonymous, confidential survey of student attitudes, health risk behaviors, and protective factors, and the District uses it as its school climate survey for the Local Control Accountability Plan. Under the MOU, the District will give the survey online to students in grades 5 and 7 with parental consent, invite private schools to take part, and run a companion School Climate Survey for staff at each school. Staff recommends that the Board approve the MOU with WestEd to give the California Healthy Kids Survey to all fifth- and seventh-grade students, at a cost not to exceed $5,000 paid with Title IV-A funds.

Approval of Agreement to Architectural Services Agreement with Studio W Architects for the M&O Building

On October 13, 2026, the Board approved design and preconstruction services for the District’s new Maintenance and Operations (M&O) Building. Since then, a closer review of building codes, City of Huntington Beach requirements, and District operational needs has added to the design work. The new work covers fire and life safety, accessibility and site improvements, energy systems, coordination with the City on driveways and drainage, and design to split construction into two phases. Staff recommends that the Board approve Amendment #1 to the agreement with Studio W Architects for additional architectural and engineering services, with a total base fee of $90,090 funded by the Special Reserve Fund for Capital Outlay Projects.
 
Stay connected with HBCSD!